Design a test that can answer
Decide the question, the measure, the guardrail and the number of visitors before the test starts.
What you will be able to do
Set up a test with one main measure, a guardrail, a planned number of visitors and a stopping rule, so its result can be trusted.
How it reaches growth
- Design a test that can answer
- Each test has one measure, a guardrail and a planned size
- Its result can be trusted when it ends
- Decisions to ship rest on real effects
- Growth from changes that really help
What it is
A test answers one question: does the change move one measure by enough to matter? Write down that measure, and the smallest change worth acting on, before anything else.
The smallest change worth acting on sets how many visitors the test needs. Smaller changes need far more visitors; if the product cannot send that many in a reasonable time, test a bolder change or answer the question another way.
Decide when the test stops before it starts, and stop it then. Checking every day and stopping on a good day turns chance into a win.
Add a guardrail: a number that must not get worse, such as refunds, cancellations or support requests.
Rules of thumb
- One main measure per test, chosen in advance.
- Plan the number of visitors from the smallest change worth acting on, and wait for it.
- Check that the split between versions matches the plan before reading any result.
Rules of thumb are starting points for a decision, not laws.
Common mistakes
- Stopping the moment the result looks good.
- Measuring ten things and reporting the one that moved.
- Running a test too small to detect any change the business would care about.
Apply it
The simulations for this topic are being made.
Get one email when it is out, and use the steps below on your own product meanwhile.
On your own product
- Take the next change your team wants to test.
- Write the main measure, the guardrail and the smallest change worth shipping.
- Ask how many weeks the test needs at your traffic, and whether that is acceptable.
Questions
How long should a test run?
Until it reaches the planned number of visitors, and for at least one full week, so every day of the week is in it.
Can I test several changes at once?
You can test several versions against the current one, but each extra version needs more visitors and raises the chance of a false win.
What if the test can never get enough visitors?
Test a bigger change, measure a step closer to the change, or decide without a test and watch the numbers closely after launch.
More in Experimentation
- Read a finished test
- Testing without much traffic (being written)
- Learning from tests (being written)